NEWSROOM

158GWh! SUPCON SOLAR Delingha 50MW Molten Salt Tower CSP Plant exceeded the designed production
Release date:2022-08-16

01The optimal matching of each system improves the overall operating efficiency

*Anti-frozenand anti-blocking:optimize the internal pipeline structure to reduce the occurrence of frozen and blocking conditions; The surface energy of the receiver can be monitored in real time, and the surface temperature can be monitored at any time. The automatic salt control system makes use of the solar field energy to speed salt melting and dredging up under frozen and blocking conditions

*Summary*:

Baidu
map